Blog - NablaFlow

The blog

News and stories about ArchiWind

New features, research studies and news from ArchiWind.

How Kajima Cut Unplanned Work Stoppages by 4 Per Year on a Government Rail Contract

On a fixed-deadline government rail contract, a single unplanned work stoppage does not just cost a day, it triggers contractual obligations, disrupts subcontractor schedules, and moves the entire programme. Kajima Corporation's site team on the Naniwasuji Line in Osaka faced exactly this risk: heavy machinery operating 30 metres above ground, surrounded by buildings that create wind conditions no regional forecast can predict. By adopting ArchiWind Live, the team replaced individual judgement calls with site-specific, continuously updated wind intelligence shared across the entire crew. The result: 4 unnecessary stoppages avoided per year, 48 person-days recovered, and an estimated €20,000–€26,000 in annual cost savings.

Temistocle Petridi image
Temistocle Petridi Marketing Expert
All blog posts
Ensuring Pedestrian Comfort in Stavanger's New Waterfront Area image
Ensuring Pedestrian Comfort in Stavanger's New Waterfront Area

Stafr and NablaFlow together to conduct a wind study on the new residential area in Stavanger.

Luca Oggiano image
Luca Oggiano CEO | CO-FOUNDER
4 steps towards better wind simulations image
4 steps towards better wind simulations

Important aspects for succeeding with wind simulations.

NablaFlow image
NablaFlow
ArchiWind results validation test case image
ArchiWind results validation test case

The results from ArchiWind are validated against experimental results.

NablaFlow image
NablaFlow

Start your 30-days free trial

Join our 30 days free trial and perform a wind assessment on a design of your choice.